TAP154782

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP154782 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.6718, -89.5650

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32620161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE8.8 mi
#45317161 kVIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154782, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154782 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN175599Substation-AdjacentTNTipton County500 kV1,000 MW1.4 yrs75.9
SHELBYSubstation-AdjacentTNTipton County500 kV1,000 MW1.4 yrs75.5
LAGOON CREEKSubstation-AdjacentTNHaywood County500 kV1,000 MW3.7 yrs73.2
Greenfield (SHELBY - CORDOVA)GreenfieldTNShelby County500 kV1,000 MW1.4 yrs72.6
Greenfield (SHELBY - CORDOVA)GreenfieldTNTipton County500 kV1,000 MW1.4 yrs71.2
TAP154797Substation-AdjacentTNTipton County161 kV100 MW1.4 yrs70.8
LONGTOWNSubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs69.8
BRIGHTONSubstation-AdjacentTNTipton County161 kV100 MW1.4 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen