TAP154775

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
500
kV

TAP154775 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.8141, -88.5228

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20559500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi
#23000500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.5 mi
#26881500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE52.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154775, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154775 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JACKSONSubstation-AdjacentTNMadison County500 kV1,000 MW3.7 yrs77.6
TAP154775Substation-AdjacentTNCarroll County500 kV1,000 MW3.7 yrs74.9
Greenfield (JOHNSONVILLE - GLEASON)GreenfieldTNWeakley County500 kV1,000 MW3.7 yrs72.7
Greenfield (JOHNSONVILLE - TAP154775)GreenfieldTNMadison County500 kV1,000 MW3.7 yrs71.6
TAP152134Substation-AdjacentTNWeakley County161 kV100 MW3.7 yrs70.8
Greenfield (JOHNSONVILLE - TAP154775)GreenfieldTNHenderson County500 kV1,000 MW3.7 yrs70.5
TAP154780Substation-AdjacentTNMadison County161 kV100 MW3.7 yrs70.3
TAP170497Substation-AdjacentTNMadison County161 kV100 MW3.7 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154775 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.