TAP154610

Substation

Tennessee · KINGSPORT POWER CO

Max voltage
161
kV

TAP154610 is an electric transmission substation in Tennessee, operated by KINGSPORT POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorKINGSPORT POWER CO
Coordinates36.3091, -83.2245

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21099161 kVKINGSPORT POWER COIN SERVICE18.1 mi
#44731161 kVKINGSPORT POWER COIN SERVICE4.3 mi
#56744161 kVKINGSPORT POWER COIN SERVICE3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154610, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154610 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PHILLIPS BENDSubstation-AdjacentTNHawkins County500 kV1,000 MW3.7 yrs77.2
Greenfield (PHILLIPS BEND - VOLUNTEER)GreenfieldTNHamblen County500 kV1,000 MW3.7 yrs73.5
DUMPLIN VALLEYSubstation-AdjacentTNJefferson County161 kV100 MW3.7 yrs72.4
Greenfield (PHILLIPS BEND - VOLUNTEER)GreenfieldTNGrainger County500 kV1,000 MW3.7 yrs71.6
BULLS GAPSubstation-AdjacentTNHamblen County161 kV100 MW3.7 yrs71.0
TAP154609Substation-AdjacentTNGrainger County161 kV100 MW3.7 yrs70.9
UNKNOWN158650Substation-AdjacentTNJefferson County161 kV100 MW3.7 yrs70.8
TAP153131Substation-AdjacentTNJefferson County161 kV100 MW3.7 yrs70.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154610 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.