TAP154559
SubstationTennessee
TAP154559 is an electric transmission substation in Tennessee. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #20518 | 100 kV | — | IN SERVICE | 0.3 mi |
| #31179 | 100 kV | — | IN SERVICE | 0.0 mi |
| #56430 | 100 kV | — | IN SERVICE | 0.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP154559, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CANE RIVER | Substation-Adjacent | NC | Yancey County | 230 kV | 300 MW | 3.7 yrs | 69.9 |
| MCDOWELL | Substation-Adjacent | NC | McDowell County | 230 kV | 300 MW | 3.7 yrs | 69.6 |
| UNKNOWN110358 | Substation-Adjacent | NC | Yancey County | 115 kV | 100 MW | 3.7 yrs | 68.9 |
| Greenfield (CANE RIVER - NAGEL) | Greenfield | TN | Unicoi County | 230 kV | 300 MW | 3.7 yrs | 68.1 |
| UNKNOWN109947 | Substation-Adjacent | NC | Buncombe County | 115 kV | 100 MW | 3.7 yrs | 67.9 |
| UNKNOWN110522 | Substation-Adjacent | NC | McDowell County | 100 kV | 50 MW | 3.7 yrs | 67.2 |
| TAP169809 | Substation-Adjacent | NC | Rutherford County | 100 kV | 50 MW | 3.7 yrs | 67.1 |
| UNKNOWN110496 | Substation-Adjacent | NC | Avery County | 161 kV | 100 MW | 3.7 yrs | 66.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP154559 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.