TAP154407 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.0654, -88.6318

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3157161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE22.2 mi
#33323161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE13.1 mi
#37424161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154407, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154407 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDDLETONSubstation-AdjacentTNHardeman County161 kV100 MW3.7 yrs69.6
TAP154407Substation-AdjacentTNMcNairy County161 kV100 MW3.7 yrs69.1
UNKNOWN115622Substation-AdjacentTNHardin County161 kV100 MW3.7 yrs68.8
TAP154414Substation-AdjacentTNHardeman County161 kV100 MW3.7 yrs68.5
UNKNOWN169436Substation-AdjacentMSAlcorn County161 kV100 MW1.4 yrs68.4
UNKNOWN154437Substation-AdjacentTNMcNairy County161 kV100 MW3.7 yrs68.4
WEST ADAMSVILLESubstation-AdjacentTNMcNairy County161 kV100 MW3.7 yrs68.2
PICKWICK LANDING DAMSubstation-AdjacentTNHardin County161 kV100 MW1.4 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154407 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.