TAP154329

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP154329 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.1433, -89.4581

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28816161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE5.9 mi
#35989161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE14.8 mi
#38120161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE11.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154329, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154329 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROWNSVILLESubstation-AdjacentTNShelby County500 kV1,000 MW1.4 yrs78.1
CORDOVASubstation-AdjacentTNShelby County500 kV1,000 MW1.4 yrs77.6
SHELBYSubstation-AdjacentTNTipton County500 kV1,000 MW1.4 yrs75.5
BENTONSubstation-AdjacentMSBenton County500 kV1,000 MW1.4 yrs74.8
Greenfield (FREEPORT - CORDOVA)GreenfieldTNShelby County500 kV1,000 MW1.4 yrs73.9
TAP154305Substation-AdjacentTNFayette County161 kV100 MW3.7 yrs73.5
Greenfield (SHELBY - CORDOVA)GreenfieldTNShelby County500 kV1,000 MW1.4 yrs72.6
CANADAVILLESubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs72.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.