TAP153934

Substation

Tennessee

Max voltage
100
kV

TAP153934 is an electric transmission substation in Tennessee. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.7379, -81.7961

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#24461100 kVIN SERVICE1.1 mi
#27207100 kVIN SERVICE3.9 mi
#46626100 kVIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153934, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153934 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LONGVIEWSubstation-AdjacentNCCatawba County230 kV300 MW3.7 yrs71.3
MCDOWELLSubstation-AdjacentNCMcDowell County230 kV300 MW3.7 yrs69.6
LONGVIEWSubstation-AdjacentNCCatawba County230 kV300 MW4.3 yrs68.9
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCCleveland County500 kV1,000 MW3.7 yrs67.8
Greenfield (LONGVIEW - MCDOWELL)GreenfieldNCBurke County230 kV300 MW3.7 yrs67.6
UNKNOWN110522Substation-AdjacentNCMcDowell County100 kV50 MW3.7 yrs67.2
TAP169809Substation-AdjacentNCRutherford County100 kV50 MW3.7 yrs67.1
UNKNOWN110496Substation-AdjacentNCAvery County161 kV100 MW3.7 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153934 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.