TAP152242

Substation

Tennessee · KINGSPORT POWER CO

Max voltage
138
kV

TAP152242 is an electric transmission substation in Tennessee, operated by KINGSPORT POWER CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorKINGSPORT POWER CO
Coordinates36.8890, -82.2324

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#866138 kVKINGSPORT POWER COIN SERVICE38.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152242, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152242 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAGELSubstation-AdjacentVAScott County500 kV1,000 MW3.7 yrs78.2
SULLIVANSubstation-AdjacentTNSullivan County500 kV1,000 MW3.7 yrs74.7
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVAWashington County500 kV1,000 MW3.7 yrs73.3
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVABristol city500 kV1,000 MW3.7 yrs72.2
UNKNOWN156532Substation-AdjacentVAWashington County138 kV100 MW3.7 yrs71.9
UNKNOWN115300Substation-AdjacentVAScott County138 kV100 MW3.7 yrs71.6
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVABristol city500 kV1,000 MW3.7 yrs70.8
TAP152242Substation-AdjacentVARussell County138 kV100 MW3.7 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.