TAP152182

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP152182 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.9107, -84.4815

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7697161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.4 mi
#28346161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.0 mi
#32463161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE8.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152182, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152182 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BULL RUNSubstation-AdjacentTNAnderson County500 kV1,000 MW3.7 yrs75.7
TAP152053Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
TAP152058Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
CROSS PARKSubstation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.3
UNKNOWN116074Substation-AdjacentTNAnderson County161 kV100 MW3.7 yrs72.9
FORT LOUDON DAMSubstation-AdjacentTNLoudon County161 kV100 MW3.7 yrs72.7
MANIS ROADSubstation-AdjacentTNLoudon County161 kV100 MW3.7 yrs72.4
UNKNOWN115540Substation-AdjacentTNRoane County500 kV1,000 MW3.7 yrs72.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152182 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.