TAP152046

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP152046 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.6706, -84.0491

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#33983161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.6 mi
#38811161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi
#58688161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152046, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152046 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BULL RUNSubstation-AdjacentTNAnderson County500 kV1,000 MW3.7 yrs75.7
TAP152048Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs74.1
TAP155213Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.8
HEISKELLSubstation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.8
TAP152053Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
TAP152058Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
TAP155233Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
UNKNOWN151203Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152046 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.