TAP145966

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
161
kV

TAP145966 is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.0196, -84.2033

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28243161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.2 mi
#65484161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.2 mi
#65485161 kVDUKE ENERGY CAROLINAS, LLC1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145966, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145966 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN110439Substation-AdjacentGAGilmer County230 kV300 MW5.8 yrs69.3
ETOWAH DISTRICTSubstation-AdjacentTNMcMinn County161 kV100 MW3.7 yrs69.0
TELLICOSubstation-AdjacentTNMonroe County161 kV100 MW3.7 yrs67.7
ETOWAH SWITCHING STATIONSubstation-AdjacentTNMcMinn County161 kV100 MW3.7 yrs66.7
TAP152016Substation-AdjacentTNPolk County161 kV100 MW3.7 yrs66.1
TAP145972Substation-AdjacentGAFannin County161 kV100 MW5.8 yrs66.1
UNKNOWN109616Substation-AdjacentNCCherokee County161 kV100 MW3.7 yrs66.0
J M HUBERSubstation-AdjacentTNMcMinn County161 kV100 MW3.7 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145966 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.