TAP145945

Substation

Tennessee

Max voltage
100
kV

TAP145945 is an electric transmission substation in Tennessee. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.3582, -82.0796

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34381100 kVIN SERVICE0.2 mi
#34382100 kVIN SERVICE2.2 mi
#39944100 kVIN SERVICE4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145945, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145945 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs77.6
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
James E. Rogers Energy ComplexBrownfieldNCRutherford1,010 MW71.9
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs71.1
Greenfield (TIGER TIE - PEACH VALLEY TIE)GreenfieldSCSpartanburg County230 kV300 MW3.7 yrs71.0
UNKNOWN110875Substation-AdjacentNCRutherford County115 kV100 MW3.7 yrs70.3
UNKNOWN110591Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145945 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.