TAP145893

Substation

Tennessee · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP145893 is an electric transmission substation in Tennessee, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.5455, -82.9613

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1095115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.4 mi
#5225115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.4 mi
#46229115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145893, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145893 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN169765Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs73.5
CRAGGYSubstation-AdjacentNCBuncombe County230 kV300 MW3.7 yrs72.4
TAP145903Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs72.4
WEST ASHEVILLESubstation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs72.3
UNKNOWN109907Substation-AdjacentNCHenderson County230 kV300 MW3.7 yrs72.2
TAP169766Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.9
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7
UNKNOWN110128Substation-AdjacentNCMadison County115 kV100 MW3.7 yrs71.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.