TAP145889

Substation

Tennessee · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP145889 is an electric transmission substation in Tennessee, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates35.5304, -82.8487

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13309115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.5 mi
#57507115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE13.4 mi
#57515115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145889, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145889 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN169765Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs73.5
CRAGGYSubstation-AdjacentNCBuncombe County230 kV300 MW3.7 yrs72.4
TAP145903Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs72.4
WEST ASHEVILLESubstation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs72.3
UNKNOWN109907Substation-AdjacentNCHenderson County230 kV300 MW3.7 yrs72.2
UNKNOWN110545Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs72.1
TAP169766Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.9
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145889 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.