TAP144704 is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.4349, -83.3589

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3355161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.9 mi
#40830161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.1 mi
#57836161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144704, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144704 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN169765Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs73.5
TAP145903Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs72.4
TAP169766Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.9
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7
UNKNOWN110048Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.0
TAP145904Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs70.5
UNKNOWN109816Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs69.5
UNKNOWN109831Substation-AdjacentNCHaywood County115 kV100 MW3.7 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.