SMITHVILLE

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

SMITHVILLE is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.0318, -85.8375

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#22111161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE16.5 mi
#31785161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE11.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SMITHVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SMITHVILLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNPutnam County500 kV1,000 MW3.7 yrs71.6
CORDELL HULLSubstation-AdjacentTNSmith County161 kV100 MW3.7 yrs71.1
DOUBLE SPRINGSSubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs70.6
HARTSVILLESubstation-AdjacentTNTrousdale County161 kV100 MW3.7 yrs70.5
UNKNOWN115278Substation-AdjacentTNPutnam County161 kV100 MW3.7 yrs70.2
GORDONSVILLESubstation-AdjacentTNSmith County161 kV100 MW3.7 yrs70.2
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNDeKalb County500 kV1,000 MW3.7 yrs70.1
SOUTH COOKEVILLESubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SMITHVILLE substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.