PARSONS

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

PARSONS is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.6379, -88.2736

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#58825161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE8.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PARSONS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PARSONS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP154775Substation-AdjacentTNCarroll County500 kV1,000 MW3.7 yrs74.9
JOHNSONVILLESubstation-AdjacentTNBenton County500 kV1,000 MW3.7 yrs73.0
Greenfield (JOHNSONVILLE - TAP154775)GreenfieldTNHenderson County500 kV1,000 MW3.7 yrs70.5
UNKNOWN159910Substation-AdjacentTNBenton County161 kV100 MW3.7 yrs69.0
JACKS CREEKSubstation-AdjacentTNChester County161 kV100 MW3.7 yrs68.3
UNKNOWN159909Substation-AdjacentTNDecatur County161 kV100 MW3.7 yrs68.3
Greenfield (JOHNSONVILLE - GLEASON)GreenfieldTNBenton County500 kV1,000 MW3.7 yrs68.3
WEST ADAMSVILLESubstation-AdjacentTNMcNairy County161 kV100 MW3.7 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PARSONS substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.