NEW JAMESTOWN

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

NEW JAMESTOWN is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.4053, -84.9333

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#38290161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW JAMESTOWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW JAMESTOWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP155428Substation-AdjacentTNCumberland County161 kV100 MW3.7 yrs70.2
CAMPBELL JUNCTIONSubstation-AdjacentTNCumberland County161 kV100 MW3.7 yrs70.0
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNPutnam County500 kV1,000 MW3.7 yrs69.8
TAP155427Substation-AdjacentTNCumberland County161 kV100 MW3.7 yrs68.6
TAP155424Substation-AdjacentTNCumberland County161 kV100 MW3.7 yrs68.6
TAP155465Substation-AdjacentTNFentress County161 kV100 MW3.7 yrs68.1
MONROESubstation-AdjacentTNOverton County161 kV100 MW3.7 yrs67.8
FREDONIASubstation-AdjacentTNCumberland County161 kV100 MW3.7 yrs66.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.