MOSCOW

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

MOSCOW is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.0630, -89.3988

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28816161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE5.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOSCOW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOSCOW substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROWNSVILLESubstation-AdjacentTNShelby County500 kV1,000 MW1.4 yrs78.1
CORDOVASubstation-AdjacentTNShelby County500 kV1,000 MW1.4 yrs77.6
BENTONSubstation-AdjacentMSBenton County500 kV1,000 MW1.4 yrs74.8
TAP154305Substation-AdjacentTNFayette County161 kV100 MW3.7 yrs73.5
Greenfield (SHELBY - CORDOVA)GreenfieldTNShelby County500 kV1,000 MW1.4 yrs72.6
CANADAVILLESubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs72.0
COLLIERVILLE GATESubstation-AdjacentTNShelby County161 kV100 MW1.4 yrs71.5
MOSCOWSubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOSCOW substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.