MONSANTO

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

MONSANTO is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.8075, -87.3593

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20816161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE20.6 mi
#27617161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE57.1 mi
#31026161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE4.3 mi
#46576161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE22.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MONSANTO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MONSANTO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DAVIDSONSubstation-AdjacentTNCheatham County500 kV1,000 MW3.7 yrs78.2
MAURYSubstation-AdjacentTNMaury County500 kV1,000 MW3.7 yrs76.4
Greenfield (DAVIDSON - MAURY)GreenfieldTNMaury County500 kV1,000 MW3.7 yrs72.8
SATURNSubstation-AdjacentTNMaury County161 kV100 MW3.7 yrs72.6
Greenfield (DAVIDSON - CUMBERLAND 500KV)GreenfieldTNDickson County500 kV1,000 MW3.7 yrs72.4
Greenfield (DAVIDSON - JOHNSONVILLE)GreenfieldTNCheatham County500 kV1,000 MW3.7 yrs72.1
Greenfield (DAVIDSON - MAURY)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs71.9
Greenfield (DAVIDSON - MAURY)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MONSANTO substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.