LORETTO
SubstationTennessee · TENNESSEE VALLEY AUTHORITY
LORETTO is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #35185 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 18.8 mi |
| #41560 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 12.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of LORETTO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MAURY | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 75.8 |
| BROWNS FERRY | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 75.7 |
| Colbert | Brownfield | AL | Colbert | — | 1,350 MW | — | 72.0 |
| Greenfield (UNION - BROWNS FERRY) | Greenfield | AL | Lawrence County | 500 kV | 1,000 MW | 1.4 yrs | 70.0 |
| LAWRENCEBURG | Substation-Adjacent | TN | Lewis County | 161 kV | 100 MW | 3.7 yrs | 69.9 |
| DUNN | Substation-Adjacent | TN | Lawrence County | 161 kV | 100 MW | 3.7 yrs | 69.8 |
| FIVE POINTS | Substation-Adjacent | TN | Lawrence County | 161 kV | 100 MW | 3.7 yrs | 69.1 |
| TAP155253 | Substation-Adjacent | AL | Lawrence County | 161 kV | 100 MW | 3.7 yrs | 69.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.