JOCASSEE SWITCHING STATION

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

JOCASSEE SWITCHING STATION is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.0478, -82.7623

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7509230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE22.5 mi
#28652230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE22.5 mi
#58445230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE26.7 mi
#58446230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE26.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JOCASSEE SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JOCASSEE SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.7 yrs72.3
UNKNOWN109907Substation-AdjacentNCHenderson County230 kV300 MW3.7 yrs72.2
UNKNOWN110545Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs72.1
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7
UNKNOWN110591Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs70.2
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.7 yrs70.0
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCGreenville County500 kV1,000 MW3.7 yrs69.8
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCPickens County500 kV1,000 MW3.7 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JOCASSEE SWITCHING STATION substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.