JELLICO

Substation

Tennessee · EAST KENTUCKY POWER COOP, INC

Max voltage
161
kV

JELLICO is an electric transmission substation in Tennessee, operated by EAST KENTUCKY POWER COOP, INC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorEAST KENTUCKY POWER COOP, INC
Co-ownerTENNESSEE VALLEY AUTHORITY
Coordinates36.5792, -84.1136

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16493161 kVEAST KENTUCKY POWER COOP, INCIN SERVICE27.3 mi
#38845161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE20.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JELLICO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JELLICO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP155224Substation-AdjacentTNAnderson County161 kV100 MW3.7 yrs69.2
TAP152041Substation-AdjacentTNAnderson County161 kV100 MW3.7 yrs68.2
PINEVILLESubstation-AdjacentKYKnox County500 kV1,000 MW3.6 yrs68.1
JELLICOSubstation-AdjacentKYWhitley County161 kV100 MW3.7 yrs68.1
LAFOLLETTESubstation-AdjacentTNCampbell County161 kV100 MW3.7 yrs66.7
WINFIELDSubstation-AdjacentKYMcCreary County161 kV100 MW3.7 yrs66.4
MCCREARY COUNTYSubstation-AdjacentKYMcCreary County161 kV100 MW3.7 yrs65.7
NORRIS DAMSubstation-AdjacentTNAnderson County161 kV100 MW3.7 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JELLICO substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.