HILLTOP

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

HILLTOP is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.7598, -87.2433

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20816161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE20.6 mi
#50339161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE37.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HILLTOP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HILLTOP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DAVIDSONSubstation-AdjacentTNCheatham County500 kV1,000 MW3.7 yrs78.2
RUTHERFORDSubstation-AdjacentTNWilliamson County500 kV1,000 MW3.7 yrs76.5
MAURYSubstation-AdjacentTNMaury County500 kV1,000 MW3.7 yrs76.4
Greenfield (PIN HOOK - DAVIDSON)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs73.9
UNKNOWN115314Substation-AdjacentTNDavidson County161 kV100 MW3.7 yrs73.6
Greenfield (DAVIDSON - MAURY)GreenfieldTNMaury County500 kV1,000 MW3.7 yrs72.8
SATURNSubstation-AdjacentTNMaury County161 kV100 MW3.7 yrs72.6
Greenfield (MAURY - FRANKLIN)GreenfieldTNMaury County500 kV1,000 MW3.7 yrs72.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen