HAMPTON

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

HAMPTON is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.2887, -82.1699

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21877161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HAMPTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HAMPTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROADFORD (765 KV)Substation-AdjacentTNSullivan County500 kV1,000 MW3.7 yrs77.9
SULLIVANSubstation-AdjacentTNSullivan County500 kV1,000 MW3.7 yrs74.7
Greenfield (SULLIVAN - NAGEL)GreenfieldTNSullivan County500 kV1,000 MW3.7 yrs72.4
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVABristol city500 kV1,000 MW3.7 yrs72.2
UNKNOWN156532Substation-AdjacentVAWashington County138 kV100 MW3.7 yrs71.9
UNKNOWN115300Substation-AdjacentVAScott County138 kV100 MW3.7 yrs71.6
Greenfield (SULLIVAN - PHILLIPS BEND)GreenfieldTNWashington County500 kV1,000 MW3.7 yrs71.6
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldTNSullivan County500 kV1,000 MW3.7 yrs71.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HAMPTON substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.