DICKSON

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

DICKSON is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.0995, -87.3697

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#37228161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE32.9 mi
#58776161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DICKSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DICKSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DAVIDSONSubstation-AdjacentTNCheatham County500 kV1,000 MW3.7 yrs78.2
CUMBERLAND 500KVSubstation-AdjacentTNHouston County500 kV1,000 MW3.7 yrs74.3
Greenfield (DAVIDSON - MAURY)GreenfieldTNMaury County500 kV1,000 MW3.7 yrs72.8
Greenfield (MONTGOMERY - CUMBERLAND 500KV)GreenfieldTNMontgomery County500 kV1,000 MW3.7 yrs72.7
Greenfield (DAVIDSON - CUMBERLAND 500KV)GreenfieldTNDickson County500 kV1,000 MW3.7 yrs72.4
Greenfield (MONTGOMERY - DAVIDSON)GreenfieldTNMontgomery County500 kV1,000 MW3.7 yrs72.2
Greenfield (MONTGOMERY - CUMBERLAND 500KV)GreenfieldTNMontgomery County500 kV1,000 MW3.7 yrs72.1
Greenfield (DAVIDSON - JOHNSONVILLE)GreenfieldTNCheatham County500 kV1,000 MW3.7 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DICKSON substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.