CLIFFSIDE

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

CLIFFSIDE is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 17 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines17

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.2208, -81.7634

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39226230 kVIN SERVICE0.2 mi
#34912230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE23.2 mi
#18085230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE14.2 mi
#24854230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE23.2 mi
#1153230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE14.2 mi
#30668100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.6 mi
#34191100 kVIN SERVICE4.8 mi
#37392100 kVIN SERVICE4.8 mi
#38286100 kVIN SERVICE4.8 mi
#39383100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE12.4 mi
#47356100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.2 mi
#52444100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE21.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLIFFSIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLIFFSIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs77.6
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
PACOLET TIESubstation-AdjacentSCCherokee County230 kV300 MW3.7 yrs74.7
CLEVELAND CNTY GENERATING FACILITYSubstation-AdjacentSCCherokee County230 kV300 MW4.3 yrs74.3
SHELBY TIESubstation-AdjacentNCCleveland County230 kV300 MW3.7 yrs73.9
James E. Rogers Energy ComplexBrownfieldNCRutherford1,010 MW71.9
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs71.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLIFFSIDE substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.