CEDAR GROVE

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

CEDAR GROVE is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.4116, -83.5833

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20405161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CEDAR GROVE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CEDAR GROVE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VOLUNTEERSubstation-AdjacentTNKnox County500 kV1,000 MW3.7 yrs77.4
Greenfield (VOLUNTEER - WATTS BAR POWER ST)GreenfieldTNUnion County500 kV1,000 MW3.7 yrs75.1
Greenfield (PHILLIPS BEND - VOLUNTEER)GreenfieldTNHamblen County500 kV1,000 MW3.7 yrs73.5
TAP155233Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
Greenfield (VOLUNTEER - BULL RUN)GreenfieldTNKnox County500 kV1,000 MW3.7 yrs73.3
Greenfield (VOLUNTEER - BULL RUN)GreenfieldTNKnox County500 kV1,000 MW3.7 yrs72.4
DUMPLIN VALLEYSubstation-AdjacentTNJefferson County161 kV100 MW3.7 yrs72.4
Greenfield (VOLUNTEER - WATTS BAR POWER ST)GreenfieldTNUnion County500 kV1,000 MW3.7 yrs72.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.