TAP135061

Substation

South Dakota · OTTER TAIL POWER CO

Max voltage
115
kV

TAP135061 is an electric transmission substation in South Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates45.7959, -96.4927

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4336115 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#17464115 kVOTTER TAIL POWER COIN SERVICE8.3 mi
#41839115 kVOTTER TAIL POWER COIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135061, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135061 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HANKINSONSubstation-AdjacentNDRichland County230 kV300 MW1.4 yrs75.3
UNKNOWN131144Substation-AdjacentSDRoberts County230 kV300 MW1.4 yrs73.6
TAP160903Substation-AdjacentMNTraverse County115 kV100 MW1.4 yrs72.8
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDRichland County400 kV600 MW1.4 yrs71.4
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs71.1
UNKNOWN135077Substation-AdjacentMNTraverse County115 kV100 MW1.4 yrs70.8
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs70.7
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs70.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP135061 substation, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.