TAP135048

Substation

South Dakota · OTTER TAIL POWER CO

Max voltage
115
kV

TAP135048 is an electric transmission substation in South Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates45.5676, -96.4318

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#33131115 kVOTTER TAIL POWER COIN SERVICE1.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135048, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135048 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG STONE SOUTHSubstation-AdjacentSDGrant County345 kV600 MW1.0 yrs71.5
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs71.1
UNKNOWN135077Substation-AdjacentMNTraverse County115 kV100 MW1.4 yrs70.8
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs70.7
UNKNOWN131969Substation-AdjacentMNLac qui Parle County115 kV100 MW1.4 yrs70.4
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNTraverse County400 kV600 MW1.4 yrs70.3
UNKNOWN131144Substation-AdjacentMNBig Stone County230 kV300 MW1.0 yrs69.9
UNKNOWN131515Substation-AdjacentMNLac qui Parle County115 kV100 MW1.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP135048 substation, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.