STEGALL

Substation

South Dakota · BLACK HILLS POWER, INC.

Max voltage
230
kV

STEGALL is an electric transmission substation in South Dakota, operated by BLACK HILLS POWER, INC.. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorBLACK HILLS POWER, INC.
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates41.8195, -103.9425

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69253230 kVBLACK HILLS POWER, INC.127.7 mi
#69273230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION93.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of STEGALL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near STEGALL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STEGALLSubstation-AdjacentNEScotts Bluff County345 kV600 MW1.7 yrs69.7
UNKNOWN202179Substation-AdjacentNEScotts Bluff County345 kV600 MW3.5 yrs69.6
UNKNOWN131802Substation-AdjacentNEScotts Bluff County230 kV300 MW3.5 yrs68.4
UNKNOWN204234Substation-AdjacentNEBanner County230 kV300 MW1.7 yrs65.1
Greenfield (UNKNOWN202528 - STEGALL)GreenfieldNEScotts Bluff County230 kV300 MW1.0 yrs64.8
UNKNOWN209367Substation-AdjacentWYGoshen County115 kV100 MW1.7 yrs64.6
Western Sugar Coop - TorringtonBrownfieldWYGoshen2 MW64.6
UNKNOWN209365Substation-AdjacentWYGoshen County115 kV100 MW1.7 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.