BOWDLE

Substation

South Dakota

Max voltage
115
kV

BOWDLE is an electric transmission substation in South Dakota. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.4636, -99.6475

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16919115 kVIN SERVICE30.6 mi
#65891115 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BOWDLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BOWDLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDWalworth County345 kV600 MW1.4 yrs68.8
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDCampbell County345 kV600 MW1.4 yrs68.2
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDEdmunds County345 kV600 MW1.4 yrs67.5
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDEdmunds County345 kV600 MW1.4 yrs67.5
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDCampbell County345 kV600 MW1.4 yrs67.0
BOWDLE JCTSubstation-AdjacentSDWalworth County115 kV100 MW1.0 yrs66.9
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDCampbell County345 kV600 MW1.4 yrs66.7
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldSDFaulk County345 kV600 MW1.4 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BOWDLE substation, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.