BLAIR

Substation

South Dakota · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
230
kV

BLAIR is an electric transmission substation in South Dakota, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates45.0115, -96.6772

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42525230 kVIN SERVICE33.2 mi
#52348230 kVIN SERVICE28.4 mi
#60089230 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE27.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BLAIR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BLAIR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG STONE SOUTHSubstation-AdjacentSDGrant County345 kV600 MW1.0 yrs71.5
UNKNOWN131144Substation-AdjacentMNBig Stone County230 kV300 MW1.0 yrs69.9
UNKNOWN175846Substation-AdjacentSDGrant County345 kV600 MW1.0 yrs69.8
UNKNOWN175849Substation-AdjacentMNBig Stone County345 kV600 MW1.0 yrs69.5
BIG STONESubstation-AdjacentSDGrant County230 kV300 MW1.0 yrs69.3
UNKNOWN175855Substation-AdjacentSDGrant County230 kV300 MW1.0 yrs69.1
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDGrant County345 kV600 MW1.4 yrs68.2
UNKNOWN175856Substation-AdjacentSDCodington County230 kV300 MW1.0 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLAIR substation, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.