ABERDEEN

Substation

South Dakota

Max voltage
115
kV

ABERDEEN is an electric transmission substation in South Dakota. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.4325, -98.4063

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21412115 kVIN SERVICE36.9 mi
#30326115 kV0.1 mi
#39694115 kVIN SERVICE3.1 mi
#65767115 kVIN SERVICE25.8 mi
#65769115 kVIN SERVICE5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ABERDEEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ABERDEEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ELLENDALE 345 KVSubstation-AdjacentSDBrown County345 kV600 MW1.4 yrs75.0
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs70.0
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs69.3
Greenfield (GROTON - LELAND OLDS)GreenfieldSDBrown County345 kV600 MW1.4 yrs69.1
Greenfield (GROTON - LELAND OLDS)GreenfieldSDBrown County345 kV600 MW1.4 yrs69.0
UNKNOWN131121Substation-AdjacentSDBrown County115 kV100 MW1.0 yrs69.0
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs68.6
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs68.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ABERDEEN substation, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.