TAP156235

Substation

Pennsylvania · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TAP156235 is an electric transmission substation in Pennsylvania, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates42.1279, -78.8038

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8926115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE13.9 mi
#8927115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE1.3 mi
#9535115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP156235, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP156235 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FIVE MILESubstation-AdjacentNYCattaraugus County345 kV600 MW3.0 yrs69.1
GLADESubstation-AdjacentPAMcKean County230 kV300 MW3.0 yrs67.8
TAP139781Substation-AdjacentPAWarren County230 kV300 MW3.0 yrs67.7
Greenfield (STOLLE ROAD - FIVE MILE)GreenfieldNYCattaraugus County345 kV600 MW3.0 yrs67.3
TAP155788Substation-AdjacentNYChautauqua County115 kV100 MW3.0 yrs66.3
TAP156233Substation-AdjacentNYCattaraugus County115 kV100 MW3.0 yrs66.1
UNKNOWN145354Substation-AdjacentNYCattaraugus County115 kV100 MW3.0 yrs65.7
LEWIS RUNSubstation-AdjacentPAMcKean County230 kV300 MW3.0 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP156235 substation, Pennsylvania. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.