TAP140130

Substation

Pennsylvania · PENNSYLVANIA ELECTRIC CO

Max voltage
115
kV

TAP140130 is an electric transmission substation in Pennsylvania, operated by PENNSYLVANIA ELECTRIC CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorPENNSYLVANIA ELECTRIC CO
Coordinates42.0596, -79.8823

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3393115 kVPENNSYLVANIA ELECTRIC COIN SERVICE24.2 mi
#26348115 kVPENNSYLVANIA ELECTRIC COIN SERVICE0.2 mi
#37052115 kVPENNSYLVANIA ELECTRIC COIN SERVICE6.7 mi
#39622115 kVPENNSYLVANIA ELECTRIC COIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140130, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140130 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EERIE SOUTHSubstation-AdjacentPAErie County345 kV600 MW3.0 yrs68.8
UNKNOWN123579Substation-AdjacentPAErie County230 kV300 MW3.0 yrs68.3
S. RIPLEYSubstation-AdjacentNYChautauqua County230 kV300 MW3.0 yrs68.3
DUNKIRKSubstation-AdjacentPAErie County230 kV300 MW3.0 yrs67.7
UNKNOWN123492Substation-AdjacentPAErie County115 kV100 MW3.0 yrs66.4
UNKNOWN123494Substation-AdjacentPAErie County115 kV100 MW3.0 yrs65.4
UNKNOWN123496Substation-AdjacentPACrawford County115 kV100 MW3.0 yrs65.4
UNKNOWN146107Substation-AdjacentPAErie County230 kV300 MW3.0 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140130 substation, Pennsylvania. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.