JENKINS

Substation

Pennsylvania · PPL ELECTRIC UTILITIES CORP

Max voltage
230
kV

JENKINS is an electric transmission substation in Pennsylvania, operated by PPL ELECTRIC UTILITIES CORP. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorPPL ELECTRIC UTILITIES CORP
Coordinates41.2540, -75.8339

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9514230 kVPPL ELECTRIC UTILITIES CORPIN SERVICE15.1 mi
#27315230 kVIN SERVICE26.5 mi
#61169230 kVPPL ELECTRIC UTILITIES CORPIN SERVICE8.5 mi
#61170230 kVPPL ELECTRIC UTILITIES CORPIN SERVICE8.5 mi
#63934230 kVPPL ELECTRIC UTILITIES CORP0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JENKINS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JENKINS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUSQUEHANNASubstation-AdjacentPALuzerne County500 kV1,000 MW3.0 yrs73.0
LACKAWANNASubstation-AdjacentPALackawanna County500 kV1,000 MW3.0 yrs70.9
NORTH MESHOPPENSubstation-AdjacentPAWyoming County230 kV300 MW3.0 yrs70.7
UNKNOWN156940Substation-AdjacentPALackawanna County230 kV300 MW3.0 yrs70.7
TAP171815Substation-AdjacentPALackawanna County230 kV300 MW3.0 yrs70.6
JENKINSSubstation-AdjacentPALuzerne County230 kV300 MW3.0 yrs70.3
UNKNOWN146484Substation-AdjacentPALuzerne County230 kV300 MW3.0 yrs69.4
Greenfield (UNKNOWN123610 - LACKAWANNA)GreenfieldPALuzerne County500 kV1,000 MW3.0 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JENKINS substation, Pennsylvania. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.