WAYNOKA GAS PROCESSING PLANT is an electric transmission substation in Oklahoma, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorOKLAHOMA GAS & ELECTRIC CO
Coordinates36.6498, -98.7676

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#35970138 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE6.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WAYNOKA GAS PROCESSING PLANT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WAYNOKA GAS PROCESSING PLANT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN149218Substation-AdjacentOKMajor County138 kV100 MW3.4 yrs66.1
Greenfield (THISTLE - WOODWARD)GreenfieldOKWoodward County345 kV600 MW3.4 yrs64.5
Greenfield (THISTLE - WOODWARD)GreenfieldKSBarber County345 kV600 MW3.4 yrs64.2
UNKNOWN118881Substation-AdjacentOKWoodward County138 kV100 MW3.4 yrs64.1
UNKNOWN118867Substation-AdjacentOKWoodward County138 kV100 MW3.4 yrs63.9
TAP168522Substation-AdjacentOKWoodward County138 kV100 MW3.4 yrs63.7
TAP149208Substation-AdjacentOKMajor County138 kV100 MW3.4 yrs63.4
Greenfield (THISTLE - WOODWARD)GreenfieldKSBarber County345 kV600 MW3.4 yrs63.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WAYNOKA GAS PROCESSING PLANT substation, Oklahoma. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.