TAP159614

Substation

Oklahoma · TRI-COUNTY ELECTRIC COOP, INC

Max voltage
115
kV

TAP159614 is an electric transmission substation in Oklahoma, operated by TRI-COUNTY ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTRI-COUNTY ELECTRIC COOP, INC
Coordinates36.6897, -101.5841

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13130115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE9.8 mi
#23283115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE8.2 mi
#26956115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE5.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP159614, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP159614 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HITCHLANDSubstation-AdjacentOKTexas County345 kV600 MW3.4 yrs68.7
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs65.8
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldKSStevens County345 kV600 MW3.4 yrs65.4
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs64.5
TAP175129Substation-AdjacentOKTexas County115 kV100 MW3.4 yrs64.3
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs64.0
Greenfield (BEAVER COUNTY - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs63.5
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP159614 substation, Oklahoma. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.