TAP160582

Substation

Ohio

Max voltage
138
kV

TAP160582 is an electric transmission substation in Ohio. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates39.8781, -80.5996

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1170138 kVIN SERVICE7.2 mi
#1171138 kVIN SERVICE0.0 mi
#1176138 kVIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160582, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160582 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN123893Substation-AdjacentPAWashington County138 kV100 MW3.0 yrs70.7
KAMMER (138KV)Substation-AdjacentOHMonroe County345 kV600 MW3.2 yrs69.9
Greenfield (WYLIE RIDGE - HARRISON)GreenfieldPAGreene County500 kV1,000 MW3.2 yrs69.9
Greenfield (WYLIE RIDGE - HARRISON)GreenfieldPAGreene County500 kV1,000 MW3.2 yrs69.5
UNKNOWN175877Substation-AdjacentPAWashington County138 kV100 MW3.0 yrs68.8
UNKNOWN123890Substation-AdjacentPAWashington County138 kV100 MW3.0 yrs68.8
Greenfield (UNKNOWN123487 - KAMMER (765KV))GreenfieldPAGreene County500 kV1,000 MW3.2 yrs68.4
Greenfield (UNKNOWN151647 - KAMMER (765KV))GreenfieldOHBelmont County765 kV1,000 MW3.2 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP160582 substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.