TAP155980 is an electric transmission substation in Ohio. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates40.7951, -82.5226

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8201138 kVIN SERVICE2.0 mi
#8202138 kVIN SERVICE0.0 mi
#10132138 kVIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155980, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155980 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113310Substation-AdjacentOHRichland County138 kV100 MW3.2 yrs68.5
TAP137863Substation-AdjacentOHAshland County138 kV100 MW3.2 yrs68.4
TAP151652Substation-AdjacentOHMorrow County138 kV100 MW3.2 yrs68.1
TAP155873Substation-AdjacentOHHuron County138 kV100 MW3.2 yrs67.5
CITY OF SHELBY ELECTRIC DISTRIBUTIONSubstation-AdjacentOHRichland County138 kV100 MW3.2 yrs67.4
UNKNOWN154259Substation-AdjacentOHRichland County138 kV100 MW3.2 yrs67.3
UNKNOWN114070Substation-AdjacentOHHuron County138 kV100 MW3.2 yrs66.3
Greenfield (GALION - SOUTH BERWICK)GreenfieldOHCrawford County345 kV600 MW3.2 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155980 substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.