TAP137802

Substation

Ohio · OHIO POWER CO

Max voltage
345
kV

TAP137802 is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates39.0242, -82.9979

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21912345 kVOHIO POWER COIN SERVICE48.9 mi
#39549345 kVIN SERVICE70.4 mi
#48807345 kVIN SERVICE70.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP137802, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP137802 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP137802Substation-AdjacentOHPike County345 kV600 MW3.2 yrs72.2
DON MARQUIS 765 KVSubstation-AdjacentOHPike County765 kV1,000 MW3.2 yrs72.1
Greenfield (FLATLICK - MARYSVILLE)GreenfieldOHVinton County765 kV1,000 MW3.2 yrs69.3
UNKNOWN116630Substation-AdjacentOHJackson County138 kV100 MW3.2 yrs69.1
Greenfield (FLATLICK - MARYSVILLE)GreenfieldOHHocking County765 kV1,000 MW3.2 yrs68.4
TAP137356Substation-AdjacentOHAdams County345 kV600 MW3.2 yrs67.4
DON MARQUISSubstation-AdjacentOHPike County345 kV600 MW3.2 yrs67.3
TAP137806Substation-AdjacentOHScioto County138 kV100 MW3.2 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.