TAP136873

Substation

Ohio · OHIO POWER CO

Max voltage
138
kV

TAP136873 is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates40.2859, -80.9537

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#26668138 kVOHIO POWER COIN SERVICE35.1 mi
#29517138 kVOHIO POWER COIN SERVICE20.3 mi
#36997138 kVOHIO POWER COIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP136873, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP136873 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CRANBERRYSubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs74.7
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs72.6
FIRSTENERGY TORONTOSubstation-AdjacentWVHancock County345 kV600 MW3.2 yrs71.6
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs71.2
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs69.8
MALVERNSubstation-AdjacentOHCarroll County138 kV100 MW3.2 yrs69.4
TIDDSubstation-AdjacentWVBrooke County345 kV600 MW3.2 yrs69.3
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHJefferson County765 kV1,000 MW3.2 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136873 substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.