SUNNYSIDE is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines8

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates40.7761, -81.3620

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2202138 kVOHIO POWER COIN SERVICE0.3 mi
#6532138 kVOHIO POWER COIN SERVICE3.3 mi
#22583138 kVOHIO POWER COIN SERVICE19.7 mi
#27151138 kVOHIO POWER COIN SERVICE3.7 mi
#31611138 kVOHIO POWER COIN SERVICE4.0 mi
#34736138 kVOHIO POWER COIN SERVICE57.7 mi
#36165138 kVOHIO POWER COIN SERVICE3.7 mi
#45347138 kVOHIO POWER COIN SERVICE2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SUNNYSIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SUNNYSIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH CANTON 765KVSubstation-AdjacentOHStark County765 kV1,000 MW3.2 yrs79.8
HIGHLANDSubstation-AdjacentOHStark County345 kV600 MW3.2 yrs77.6
SOUTH EAST CANTONSubstation-AdjacentOHStark County345 kV600 MW3.2 yrs74.6
UNKNOWN153863Substation-AdjacentOHStark County345 kV600 MW3.2 yrs74.2
STARSubstation-AdjacentOHSummit County345 kV600 MW3.2 yrs73.5
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs72.6
TAP137184Substation-AdjacentOHSummit County138 kV100 MW3.2 yrs72.5
LAKEMORESubstation-AdjacentOHSummit County138 kV100 MW3.2 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SUNNYSIDE substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.