PIERCE

Substation

Ohio · DUKE ENERGY

Max voltage
345
kV

PIERCE is an electric transmission substation in Ohio, operated by DUKE ENERGY. It is classified as high-voltage (345 kv) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines9

Ownership & operation

OperatorDUKE ENERGY
Co-ownerDUKE ENERGY OHIO INC
StateOhio
Coordinates39.0266, -84.0618

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2570345 kVIN SERVICE71.5 mi
#4058345 kVDUKE ENERGYIN SERVICE24.0 mi
#27846345 kVIN SERVICE71.5 mi
#39549345 kVIN SERVICE70.4 mi
#48807345 kVIN SERVICE70.4 mi
#25656345 kVIN SERVICE18.0 mi
#4444138 kVDUKE ENERGY OHIO INCIN SERVICE0.1 mi
#4933138 kVDUKE ENERGY OHIO INCIN SERVICE0.2 mi
#49539138 kVDUKE ENERGY OHIO INCIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PIERCE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PIERCE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113019Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs78.5
UNKNOWN113763Substation-AdjacentOHHamilton County345 kV600 MW3.2 yrs78.5
TAP137571Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs78.3
FOSTERSubstation-AdjacentOHWarren County345 kV600 MW3.2 yrs77.8
TAP137572Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs77.6
BECKJORDSubstation-AdjacentKYCampbell County345 kV600 MW3.2 yrs77.3
UNKNOWN113020Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs75.7
SILVER GROVESubstation-AdjacentKYCampbell County345 kV600 MW3.2 yrs73.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PIERCE substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.