PERRY

Substation

Ohio · AMERICAN TRANSMISSION SYSTEMS, INC.

Max voltage
345
kV

PERRY is an electric transmission substation in Ohio, operated by AMERICAN TRANSMISSION SYSTEMS, INC.. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorAMERICAN TRANSMISSION SYSTEMS, INC.
StateOhio
Coordinates41.7743, -81.2052

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8919345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE9.8 mi
#8921345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE9.8 mi
#20631345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE23.2 mi
#29954345 kV0.2 mi
#32613345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE20.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PERRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PERRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN137113Substation-AdjacentOHGeauga County345 kV600 MW3.2 yrs77.7
UNKNOWN113660Substation-AdjacentOHCuyahoga County345 kV600 MW3.2 yrs77.2
PERRYSubstation-AdjacentOHLake County345 kV600 MW3.2 yrs74.2
EASTLAKE STATIONSubstation-AdjacentOHLake County345 kV600 MW3.2 yrs73.5
TAP137153Substation-AdjacentOHCuyahoga County138 kV100 MW3.2 yrs72.3
UNKNOWN113742Substation-AdjacentOHCuyahoga County138 kV100 MW3.2 yrs72.2
Greenfield (UNKNOWN113607 - UNKNOWN137113)GreenfieldOHCuyahoga County345 kV600 MW3.2 yrs72.2
UNKNOWN113820Substation-AdjacentOHCuyahoga County138 kV100 MW3.2 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PERRY substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.