PEEBLES
SubstationOhio · OHIO POWER CO
PEEBLES is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #24951 | 138 kV | OHIO POWER CO | IN SERVICE | 8.0 mi |
| #33114 | 138 kV | OHIO POWER CO | IN SERVICE | 20.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PEEBLES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| J M STUART | Substation-Adjacent | OH | Highland County | 345 kV | 600 MW | 3.2 yrs | 72.4 |
| ATLANTA | Substation-Adjacent | OH | Highland County | 345 kV | 600 MW | 3.2 yrs | 70.8 |
| KILLEN | Substation-Adjacent | OH | Adams County | 345 kV | 600 MW | 3.2 yrs | 69.7 |
| UNKNOWN113606 | Substation-Adjacent | OH | Adams County | 345 kV | 600 MW | 3.2 yrs | 68.6 |
| TAP137355 | Substation-Adjacent | OH | Adams County | 345 kV | 600 MW | 3.2 yrs | 68.5 |
| UNKNOWN121396 | Substation-Adjacent | KY | Mason County | 345 kV | 600 MW | 3.2 yrs | 68.0 |
| TAP137356 | Substation-Adjacent | OH | Adams County | 345 kV | 600 MW | 3.2 yrs | 67.4 |
| DON MARQUIS | Substation-Adjacent | OH | Pike County | 345 kV | 600 MW | 3.2 yrs | 67.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.