PACKARD
SubstationOhio
PACKARD is an electric transmission substation in Ohio. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #17878 | 138 kV | — | IN SERVICE | 3.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PACKARD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SOUTH CANTON 765KV | Substation-Adjacent | OH | Stark County | 765 kV | 1,000 MW | 3.2 yrs | 79.8 |
| HIGHLAND | Substation-Adjacent | OH | Stark County | 345 kV | 600 MW | 3.2 yrs | 77.6 |
| SOUTH EAST CANTON | Substation-Adjacent | OH | Stark County | 345 kV | 600 MW | 3.2 yrs | 74.6 |
| UNKNOWN153863 | Substation-Adjacent | OH | Stark County | 345 kV | 600 MW | 3.2 yrs | 74.2 |
| STAR | Substation-Adjacent | OH | Summit County | 345 kV | 600 MW | 3.2 yrs | 73.5 |
| Greenfield (KAMMER (765KV) - SOUTH CANTON ) | Greenfield | OH | Carroll County | 765 kV | 1,000 MW | 3.2 yrs | 72.6 |
| TAP137184 | Substation-Adjacent | OH | Summit County | 138 kV | 100 MW | 3.2 yrs | 72.5 |
| LAKEMORE | Substation-Adjacent | OH | Summit County | 138 kV | 100 MW | 3.2 yrs | 72.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PACKARD substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.