NEW DEPARTURE

Substation

Ohio · OHIO EDISON CO

Max voltage
138
kV

NEW DEPARTURE is an electric transmission substation in Ohio, operated by OHIO EDISON CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorOHIO EDISON CO
StateOhio
Coordinates41.4317, -82.7226

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11276138 kVIN SERVICE28.9 mi
#11305138 kVOHIO EDISON COIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW DEPARTURE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW DEPARTURE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN158972Substation-AdjacentOHErie County345 kV600 MW3.2 yrs76.3
UNKNOWN154271Substation-AdjacentOHErie County138 kV100 MW3.2 yrs70.6
Greenfield (DAVIS-BESSE - BEAVER)GreenfieldOHErie County345 kV600 MW3.2 yrs69.3
Greenfield (BEAVER - UNKNOWN158972)GreenfieldOHErie County345 kV600 MW3.2 yrs69.3
Greenfield (DAVIS-BESSE - BEAVER)GreenfieldOHErie County345 kV600 MW3.2 yrs69.2
UNKNOWN114067Substation-AdjacentOHHuron County138 kV100 MW3.2 yrs68.9
Greenfield (DAVIS-BESSE - BEAVER)GreenfieldOHErie County345 kV600 MW3.2 yrs68.4
AVERYSubstation-AdjacentOHErie County138 kV100 MW3.2 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen