HAMILTON PEAKING

Substation

Ohio

Max voltage
138
kV

HAMILTON PEAKING is an electric transmission substation in Ohio. It is classified as sub-transmission (138 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines7

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates39.3626, -84.5275

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10986138 kVIN SERVICE2.0 mi
#11036138 kVIN SERVICE1.9 mi
#11086138 kVIN SERVICE2.8 mi
#11091138 kVIN SERVICE8.1 mi
#11106138 kVIN SERVICE5.6 mi
#60515138 kVIN SERVICE2.1 mi
#63994138 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HAMILTON PEAKING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HAMILTON PEAKING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113019Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs78.5
UNKNOWN113763Substation-AdjacentOHHamilton County345 kV600 MW3.2 yrs78.5
TERMINALSubstation-AdjacentOHHamilton County345 kV600 MW3.2 yrs78.3
TAP137571Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs78.3
FOSTERSubstation-AdjacentOHWarren County345 kV600 MW3.2 yrs77.8
TAP137572Substation-AdjacentOHWarren County345 kV600 MW3.2 yrs77.6
WOODSDALESubstation-AdjacentINDearborn County345 kV600 MW3.0 yrs77.4
WOODSDALESubstation-AdjacentOHButler County345 kV600 MW3.2 yrs77.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HAMILTON PEAKING substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.